Cable and Controller installation

CONTROLLER INSTALLATION

  • Find a location near the two sources of power to mount the bracket that holds the controller.
  • Fasten the Controller Mount into place with the bracket to the side facing right as shown. Use two Drywall Screws to fasten. 

 

  • With the supplied screws, mount the controller to the bracket with the antennas pointing up.
  • Fasten the two supplied antennas to the top as shown.

 

CABLE INSTALLATION

  • With the gutter caps pulled up, take the power cable bundle and set it on the lane next to the drop sweep. Take the correct end that is to be run to the Sensor and run it along side of the return track to the sensor.
  • Take the other end of the power cable and run up the pinsetter frame along with the existing cables that are already on the pinsetter. Run this to the power source.
  • Do the exact same steps with the Green network cable as you did with the power                cable.
  • Once all of the cables are ran, take the two bundles and place neatly between the two        kickbacks. Wire tie both bundles.
  • You can now wire tie the cables in place.
     
  • Note: If a firewall exists, such as AMF scoring system, a switch will need to be installed         before the AMF router.

Was this article helpful?

Can’t find what you’re looking for?

Our award-winning customer support team is here for you.


24/7 TECH SUPPORT
Free award-winning tech support:
US Toll-Free: (800) 280 2695
International: +1 863 734 0200